In the beginning, the Jai Hind metro station was prepared for being elevated. Nevertheless, the AAI objected which the elevated stretch up towards the airport could possibly pose a risk to aircraft, Hence the route was further more reworked and the station was shifted underground, 150 m from your Airport terminal constructing.The fares in the metr